The installation and maintenance of the pulverizer
Source:http://www.dgjitian.comViews:
Maintenance of the machine is a very important regular work, it should be extremely operational and maintenance and other closely with the full-time staff should be on duty inspection.
1. Machine maintenance:
1, the bearing bear the full load of the machine, so good lubrication on the bearing life has a great relationship, it directly affects the machine life and operating rate, which requires the injection of lubricating oil must be clean, the seal must be good, the machine Main oiling (1) Rotary bearings (2) Roll bearings (3) All gears (4) Movable bearings, sliding surfaces.
2, the new installation of the wheel prone to loose must be regularly checked.
3, pay attention to the work of the various parts of the machine is normal.
4, pay attention to check the wear and tear of the wear and tear, pay attention to replace the wear parts.
5, put the activities of the chassis plane, should be out of dust and other objects in order to avoid the machine can not break the material when the activities of the bearings can not move on the chassis, resulting in serious accidents.
6, bearing oil temperature rise, should immediately stop to check the cause to be eliminated.
7, rotating gear in the operation if the impact should immediately stop the inspection and eliminate
2. Installation test:
1, the equipment should be installed on the basis of the level of concrete, with anchor bolts.
2, the installation should pay attention to the main body and horizontal vertical.
3, after installation, check whether the various parts of the bolt loose and the mainframe door is tight, if any, please fasten.
4, according to the power of the equipment configuration power lines and control switches.
5, check is completed, the empty load test, the test can be normal production.